Monday, October 25, 2010

The construction zone

Preparing the patio for the new concrete - the roofers are working on the roof at the same time.
So, it's very "busy" around here.


You can see the new plywood that had to be replaced. Below,
before the new plywood. We had a lot of rotten spots.



We also took the brick off of the garage. A huge crack developed from the ground settling. We dug down the the bottom of the foundation and had an engineer look at it. He felt that it wouldn't sink much more. But we decided to get some weight off of the wall by taking off the brick. We will replace it with siding.

0 Comments:

Post a Comment

<< Home